Quick answer
Before Prefab, back up the original, confirm format/size/quality requirements and close programs that lock the file. Prefab depends on size/material/delivery/install.
Why it matters
Poor preparation leads to overwrites, failures and rework.
Size.
Step by step
- Check size/use/foundation/permits/HOA/electrical.
- Separate shed/foundation/delivery/install/electrical.
- Get 2-3 quotes; confirm size/material/warranty.
- Contract states scope/foundation/permits/payment.
Common mistakes
- Shed price only, not foundation/delivery/install.
- Ignoring permits/HOA/size.
- Not checking electrical/insulation.
- No warranty/payment terms.
Checklist
- Size/use/foundation/permits/HOA.
- Shed/delivery/install/electrical.
- Roof/siding/insulation/moisture.
- Warranty/payment/contract.
- Budget/maintenance/removal.
Key facts
- Size.
- Delivery.
- Install.
FAQ
How should I prepare before Prefab?
Before Prefab, back up the original, confirm format/size/quality requirements and close programs that lock the file. Prefab depends on size/material/delivery/install.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Angi